County Road Approach Policy & Criteria

ARCGIS Online Approach / Access Permit Dashboard Tool

Franklin County Public Works is gradually implementing an online approach permit status tool using ARCGIS. 

Access the Online Approach / Access Permit Dashboard. ARCGIS Dashboard is best viewed in either Microsoft Edge or Google Chrome.

ARCGIS Permit Graphic

Road Approach / Access Permit

Per Revised Code of Washington (RCW) 36.75.130, road approaches fall under the regulation of Franklin County. If any of the following apply to your project, then a road approach permit is required.

  • Construction of any dwelling or accessory dwelling
  • Construction of an accessory structure valued at $25,000 or more
  • Construction of any commercial, industrial, or agricultural structure
  • Placement or replacement of a manufactured home
  • Enlarging any dwelling or accessory structure with the value of the addition being thirty-three % (33%) or more of the value of the current structure
  • Enlarging any dwelling or accessory structure's gross floor area by more than fifty % (50%), regardless of value
  • Ingress or egress to a County road for commercial, industrial, or agricultural purposes other than temporary approaches

Applying for a Road Approach / Addressing Permit

  1. Download the Approach Permit Packet (PDF) and refer to the Approach Permit Policy (PDF)
  2. Review the Approach Permit Packet, complete the upper half of the Approach Permit, and attach a Site Plan
  3. Submit Application and site plan for review to the Public Works Department by
    1. Email: permits@franklincountywa.gov
    2. Drop off at Franklin County Public Works, 3416 Stearman Avenue, Pasco, WA 99301
    3. Fax 509-545-2133
  4. Once the application is submitted, Public Works will begin the review process. Reviews can take up to 10 business days.
  5. Once the permit is ready for signature, a notification will be sent out to the applicant. Contractors are not permitted to sign an approach permit on behalf of landowners.
  6. Payment for permits can be made via Point and Pay. See the Point and Pay Tutorial (PDF) on how to make an online payment.
  7. A copy of the approved permit will be provided to the applicant and forwarded to the Building Department.
  8. Inspections for all installed building materials for the approach shall be called 48 hours in advance.
  9. Once the applicant has met the conditions of their issued approach permit, a copy of the final approval will be submitted to the Building Department.

If you have further questions, please contact our office at 509-545-3514, option 1

Proceso Para un Permiso de Acceso a la Carretera del Condado de Franklin

Aplique Para un Acceso a la Carretera / Proceso de un permiso

Para iniciar el proceso de aplicación siga los siguientes pasos:

  1. Siga las instrucciones del Approach Permit Packet (PDF) y haga referencia al Approach Permit Policy (PDF). (por sus nombres en inglés)
  2. Siga las instrucciones del Paquete de Permiso de acceso a la carretera (Approach Permit Packet), complete la primera mitad de la aplicación Permiso de Acceso a la Carretera, y haga un Plano que represente la localización del acceso.
  3. Usted puede presentar su plano para que sea revisado por el Departamento de Obras Publicas por:
    1. Correo electrónico : permits@franklincountywa.gov
    2. Puede entregarlo en persona en el Departamento de Obras Públicas, 3416 Stearman Avenue, Pasco, WA 99301
    3. Fax 509-545-2133
  4. Una vez que el solicitante haya presentado la aplicación del permiso, el Departamento de Obras Publicas iniciara el proceso de revisión. Dicha revisión puede tomar hasta 10 días laborales.
  5. Dicho solicitante será notificado cuando el permiso esté listo para ser firmado. No se permite que contratistas firmen un permiso de acceso en representación del propietario.
  6. Cuota por el permiso pueden ser hecha por Point and Pay, por favor siga las instrucciones del tutorial Point and Pay Tutorial (PDF) para pagar en línea.
  7. Se le otorgara una copia del permiso autorizado al solicitante y también se le mandara una copia al Departamento de Construcción.
  8. Usted debe de contactar al Departamento de Obras Públicas para acordar una inspección de su obra, por favor llame con 48 horas de anticipación.
  9. Una vez que el solicitante haya cumplido con las condiciones establecidas en el permiso, una copia final del permiso aprobado será enviada al departamento de construcción.

Por favor de contactar a la oficina de Obras Publicas al 509-545-3514, opción 1, para más información.

Related Documents